Battery Storage in New York — The Landscape

The backdrop for every battery case on this site. Battery energy storage (BESS) is where New York’s climate goals most directly meet local land-use control.

The state goal

Local moratoria and bans

The catalyst (the Warwick fire)

On December 19, 2025, a lithium-ion BESS at Convergent Energy’s Church Street (“West Warwick 3”) facility in the Village of Warwick (Orange County) caught fire. Air monitoring detected hydrogen cyanide at 0.5 ppm beside the facility (downwind readings were zero). Officials said the fire involved an “unauthorized,” non-compliant system that should not have been operating, and that water infiltration triggered it — the same cause cited in a 2023 fire. The incident became the rallying point for a fresh wave of moratoria. (Village of Warwick; Energy-Storage.news)

Note: the Warwick fire involved an unauthorized, non-compliant system — a detail relevant to whether the appropriate response is enforced safety standards or broad prohibition.

The policy question (who decides)

The core question is state siting vs. home rule. Bills S5506 / A8378 would extend the Office of Renewable Energy Siting (ORES) — which already streamlines large renewables past local approval — to standalone battery storage (qualified systems ≥25 MW). Both remain in the Senate’s Energy & Telecommunications Committee — last action a Jan 7, 2026 referral, and neither has passed either chamber as of mid-2026. (NY Senate, S5506) The outcome bears directly on whether the 6 GW target is reachable.

Hudson Valley inventory (active restrictions)

Each row below has its own case file. Scope is from the town’s actual law text where a case file exists — and several differ from the statewide tracker, which labels a number of these “utility-scale” when the adopted law covers all battery storage. (Carina Energy)

CountyTownTypeScopeCase file
UlsterPlattekillBanALL_BESSplattekill-mission-clear
UlsterTown of UlsterContested projectalcazar-ess-terra-gen
UlsterSaugertiesContested projectsaugerties-kce-tomsons-road
UlsterHurleyMoratorium → drafting banLarge-scalehurley-bess-moratorium
UlsterGardinerMoratorium (project stalled)>600 kWhgardiner-mckinstry-road-bess
DutchessStanfordMoratoriumALL_BESS + windstanford-bess-moratorium
ColumbiaClaverackMoratoriumUnconfirmedclaverack-bess-moratorium
ColumbiaLivingstonMoratoriumALL_BESSlivingston-bess-moratorium
ColumbiaStockportMoratoriumALL_BESSstockport-bess-moratorium
GreeneAthensMoratoriumALL_BESSathens-bess-moratorium
OrangeChesterMoratorium≥600 kWhchester-bess-moratorium
OrangeMontgomeryBanAll storage (reported)montgomery-kce-ny-11
OrangeWarwickDelivered (+ fire)warwick-convergent-bess

Delivered counter-examples. Warwick (Orange County) is the one Hudson Valley BESS that was sited, approved, and energized — and then became the region’s cautionary fire story. For a clean, uncontested “the process works” build, KCE NY 6 in Erie County (Western NY) is included as an out-of-region comparison.

Sources