Battery energy storage (BESS) is where New York’s climate goals most directly meet local land-use control. This page sets the statewide context for the individual projects documented across the site.
This site documents a collision between two forces pushing in opposite directions. From the top down, New York’s climate law sets a binding statewide goal — 6 GW of energy storage by 2030 — and the state’s grid operator treats storage as a tool for absorbing the wind and solar the same law mandates. From the bottom up, land-use authority over a standalone battery rests entirely with the town (why a town can block a battery but not a large solar farm), and towns have answered with a wave of moratoria and bans. Standalone storage sits in the crossfire.
The two sides are argued on different terms, and the site tries to keep them straight:
Stating the grid rationale as fact does not prejudge any case: whether to pursue 6 GW is a policy choice, while where a battery may be sited is a local one. They sit on different axes, and the site keeps them apart on purpose.
On December 19, 2025, a lithium-ion BESS at Convergent Energy’s Church Street (“West Warwick 3”) facility in the Village of Warwick (Orange County) caught fire. Air monitoring detected hydrogen cyanide at 0.5 ppm beside the facility (downwind readings were zero). The Village of Warwick, as the permitting authority, issued a Notice of Violation and Condemnation Order and recorded that Convergent “does not currently hold a Certificate of Compliance due to its failure to comply with enhanced safety monitoring requirements and should not have been operational,” its counsel’s letter addressing “the unauthorized activation of the system.” The cause is not established. The Village’s own record says the “severe rain and wind prior to the fire may have contributed to water infiltration” but that it is “too early to definitively determine the cause,” and the root-cause analysis was still pending as of its April 6, 2026 update; NYSERDA separately told the Village that the 2023 fire “was determined to have been caused by water infiltration.” The incident became the rallying point for a fresh wave of moratoria. (Village of Warwick; Energy-Storage.news)
Note: the Village’s finding that the unit was operating without a current Certificate of Compliance — what its counsel’s letter called “the unauthorized activation of the system” — is a detail relevant to whether the appropriate response is enforced safety standards or broad prohibition.
For the full fire record — both incidents, the emergency response, what a lithium-ion storage fire involves, how often these fires occur, and New York’s regulatory response — see the Warwick fire explainer.
The core question is state siting vs. home rule — why a town can block a standalone battery but not a large solar or wind farm. Bills S5506 / A8378 would extend the Office of Renewable Energy Siting (ORES) — which already streamlines large renewables past local approval — to standalone battery storage (qualified systems ≥25 MW). Both remain in the Senate’s Energy & Telecommunications Committee — last action a Jan 7, 2026 referral, and neither has passed either chamber as of mid-2026. (NY Senate, S5506) The outcome bears directly on whether the 6 GW target is reachable.
Every row has its own file, and the scope and status below come from the town’s adopted law text, not from a statewide tracker. That distinction matters: reconciling this table against the filed laws (July 2026) changed six of thirteen rows. Several towns the tracker labels “utility-scale” have adopted laws reaching all battery storage; conversely, several bans and moratoria carve out residential-scale systems, which a flat “all storage” label hides. Two moratoria have quietly lapsed, and one town has finished — it now permits storage under a regular zoning law. (Carina Energy)
| County | Town | Instrument | Status | Scope (per the adopted law) | File |
|---|---|---|---|---|---|
| Ulster | Plattekill | Permanent zoning ban | In force | Large-scale only — modest home systems still allowed | plattekill |
| Ulster | Town of Ulster | (no restriction) | Contested project | — | alcazar-ess-terra-gen |
| Ulster | Saugerties | (no restriction) | Contested project | — | saugerties-kce-tomsons-road |
| Ulster | Hurley | Moratorium (extended) | In force; permanent ban being drafted | All BESS, excluding residential storage paired with solar | hurley |
| Ulster | Gardiner | Moratorium (extended) | In force | >600 kWh | gardiner-mckinstry-road-bess |
| Dutchess | Stanford | Moratorium (renewal unconfirmed) | Uncertain — 2025 renewal not confirmed enacted | All BESS and wind, excluding single-family residential | stanford |
| Columbia | Claverack | Moratorium (re-enacted) | Lapsed? — nothing on record since Feb 2026 | All BESS, every district | claverack |
| Columbia | Livingston | Permitting regulation | Resolved — storage is now permitted | Tiered: ≤30 kWh residential by-right, larger by permit | livingston |
| Columbia | Stockport | Moratorium | In force | All BESS, every district | stockport |
| Greene | Athens | Moratorium | Lapsed? — 6-month term, no renewal located | All BESS | athens |
| Orange | Chester | Moratorium (extended twice) | In force to Aug 2026 | ≥600 kWh; under-600 kWh home/farm/business backup exempt | chester |
| Orange | Montgomery | Permanent zoning ban | In force | All utility & commercial BESS; 1–2-family residential exempt | montgomery |
| Orange | Warwick | (no restriction) | Delivered (+ fire) | — | warwick-convergent-bess |
What the corrected table shows. The instruments are not interchangeable. Two towns have made storage permanently unbuildable at scale (Plattekill, Montgomery) — but both still permit household batteries, so even the bans are narrower than “no storage here.” Most of the rest are pauses, and pauses expire: Athens’ six-month moratorium has no located renewal, and Claverack’s re-enacted pause has nothing on the record past February 2026. Livingston is the one town that finished the job — it used the pause to write a tiered permitting law and now allows battery storage, the outcome a moratorium is nominally for.
Delivered counter-examples. Warwick (Orange County) is the one Hudson Valley BESS that was sited, approved, and energized — and then became the region’s cautionary fire story. For a clean, uncontested “the process works” build, KCE NY 6 in Erie County (Western NY) is included as an out-of-region comparison.
WebFetch and a browser-UA request, read via the Wayback Machine)