A 150 MW / 4-hour battery proposed on Frank Sottile Boulevard — the same site where a fossil-fuel peaker was abandoned for a 20 MW battery in 2019. Under coordinated SEQRA review as a Type I action since May 2026, in the same town as the far larger Alcazar proposal.
Town of Ulster · Ulster County · Energy storage · Status: in progress — classified a Type I action, coordinated SEQRA review commenced May 21, 2026
Lincoln Park Energy Storage LLC proposes a 150 MW / 4-hour battery system on three tax parcels bisected by Frank Sottile Boulevard, near its intersection with Miron Lane and NYS Route 32. The town's resolution describes it as "a 150 MW/4-hour battery energy storage system, battery containers, inverters, an approximately 76,782 square foot one-story building, a project substation, project switchyard, stormwater management facilities, utility improvements, access improvements, and related site work," on a site of about 33.57 acres of which about 10.28 acres would be physically disturbed. (Town of Ulster) BayWa r.e. carries the project on its own portfolio at 150 MW / 600 MWh, with an expected operational date in the winter of 2030. (BayWa r.e.)
The parcels sit in the Office-Manufacturing district, which permits utility structures by right after site-plan review — but only up to 3,500 square feet. This project exceeds that, so it also needs a Special Use Permit from the Town Board. (Lincoln Park Energy Storage FEAF Part 1)
This is not a new fight on a new site. The applicant — previously named Lincoln Park DG LLC — describes the current filing as "an update to the previously approved site plan," and dates that approval to November 21, 2019. What was approved then was much smaller: a 20 MW battery-only facility of roughly 25,000 battery modules, about 80 MWh, eight inverters and an area of about 30,022 square feet. (FEAF Part 1) The current proposal is more than seven times that power rating.
That 20 MW battery was itself a substitution. GlidePath and NYSERDA announced it — as the "Lincoln Park Grid Support Center" — in December 2019, on a site where a fossil-fuel plant had been planned. (GlidePath) The local group that had campaigned against the gas plant, Town of Ulster Citizens, treated the switch as a win, calling the battery-only project "very welcome news" and writing that "GlidePath has responded to the overwhelming negative community feedback to their fossil fuel Peaker plant proposal, and has changed the project to a battery-storage only project." (Town of Ulster Citizens) That page has not been updated since 2021 and says nothing about the current proposal — the group's view of a 150 MW facility is not on record anywhere located.
The sources do not fully agree on what became of the 2019 approval. The applicant treats it as a live site plan being updated; the Daily Freeman describes the earlier GlidePath project as "controversial and ultimately withdrawn." (Daily Freeman) Both are recorded here; neither is treated as settled.
The developer briefed the public before filing rather than after. At a March 5, 2026 workshop, Supervisor James Quigley told the Town Board that "a developer acquired the GlidePath site on Frank Sottile Boulevard in anticipation of making a submittal to the town of Ulster Planning Board," and that "as part of their outreach, I've asked them to conduct a community information session for the benefit of the community prior to making the submission to the planning board." (Town of Ulster) That session was held on March 18, 2026 at the Town Hall. (Daily Freeman)
The applicant signed its Full Environmental Assessment Form on March 26 and submitted it dated March 27, 2026. On May 12, 2026 the Planning Board heard the presentation as "Lincoln Park Energy – P-994"; the minutes end the item with "No action was taken." (Town of Ulster)
On May 21, 2026 the Town Board classified the proposal a Type I action under SEQRA — "based upon the size, nature, and scope of the proposed action, including physical disturbance in excess of ten acres and potential impacts to regulated environmental resources" — and resolved to declare its intent to serve as lead agency, commencing coordinated review. It took the Special Use Permit as its hook: the Board is "the appropriate agency to declare its intent to serve as Lead Agency because the Special Use Permit approval is central to the proposed action." The resolution is explicit that the Board "makes no final determination at this time concerning environmental significance, project approval, denial, or conditions of approval." (Town of Ulster)
update to the previously approved site plan
Obviously, a positive declaration creates a new set of hurdles,
monitored 24 hours a day
Two things make this case worth reading alongside Alcazar, which is roughly half a mile away in the same town.
The first is that the developer is openly steering by the other project's record. BayWa's spokesman Will Callaway told the Daily Freeman that the company had been following the Terra-Gen application, and that what it wants to avoid is the positive declaration of significant environmental impacts that the Town Board issued there: "Obviously, a positive declaration creates a new set of hurdles," he said, "and we're hoping to get a negative declaration so that there will not be a kind of rewrite of our site plan and other aspects of the project." The town is steering by the same record from the other side. Quigley: "I have made it clear to BayWa that everything that has gone on with Terra-Gen is public knowledge. The conversations that we've had are basically (saying), 'We're watching. We're not going to make the same mistakes.'" (Daily Freeman) A pre-filing community session, arranged at the Supervisor's request, is what that looks like in practice.
The second is siting. The Freeman reports the nearest residential property about 1,377 feet from the battery site, roughly 75 single- and multi-family dwellings within 3,600 feet, and the 164-unit Ulster Gardens apartment complex about 2,825 feet away. The applicant's own filing measures from a different point and gets much shorter numbers — the closest residence is "approximately 400 feet from the proposed switchyard," and the back of the Planet Fitness at Dena Marie Plaza about 330 feet from it. Both sets are reproduced here because they answer different questions, and quoting either alone would mislead. What is not in dispute is the surrounding land: a county landfill with an approved solar array to the north, an active mine to the east, a shopping centre to the west. (Daily Freeman; FEAF Part 1)
What this file does not have is an opposition column, and that should be read as a gap rather than as a result. This project was absent from this site's inventory entirely until 2026-07-27, when the Town of Ulster's minutes were opened here for the first time; the search for local reaction was a single pass, the town's June and July records are not yet posted, and no write-up of the March community session was located. The comparison is instructive: at Terra-Gen's project down the road, the Daily Freeman describes opponents including "some residents, several fire officials, and a few elected officials." Whether the same is true here is an open question in watch, not an answered one.
These marks record whether we opened the document behind the link — not how good the source is. How we verify.